Recent Projects


2010 - GULFPOINTE  CONDOMINIUM ASSOCIATION - VACUUM SEWER SYSTEM

Installation of Vacuum Sewer system - Vacuum Main Lines, Vacuum Pits and valves

Installation of Vacuum Pit 5.5' combined with gravity Laterals

Provided Special Equipment


Year: 2010
Location: 12690 Overseas Highway - Marathon FL 33050
Existing System: Gravity Laterals combined with Septic tanks 
Description: 2,000 LF. of 4" Vacuum Main, installation of 8 AirVac Vacuum Pits, connection of Gravity Sewer Laterals for 10 Buildings (40 Units)
Duration: 6 Months. (Soil conditions Coral Rock)
System is directly connected to City of Marathon Area 6 Sewer Central System at US1
Contact Information: Home Owner Association Gulf Associations 1&2




2010/2011 - THE HAMMOCKS AT MARATHON

Installation of Dual Buffer Tank and Manhole, Installation of 4" Force Main and 6" Vacuum Main, Abandonment of existing Waste Water Treatment Plant and Abandonment of Sewer Injection Wells - Eng Glen Boe and Associates
Installation of 4" vacuum Main
Installation of Force Main
Installation of Manhole & Buffer Tank
Installation of Concrete Structures






Year: 2010/2011
Location: 1688 Overseas Highway - Marathon
Existing System: WWTP combined with Force Main and Gravity Sewer
Description: Installation of 600 LF of Force main, installation of 2 Concrete Structures, Vacuum Main and demolition of existing WWTP
System under operation and connected to the City of Marathon Central Sewer System
Contact Information: The Hammocks at Marathon/Bluegreen Corp.

2012 OCEAN BEACH CLUB RESORT

Replaced of All Cast Iron Sewer System  for PVC, replaced all water supply lines, upgrade the complete drainage and water system for the entire resort 
Underground - New System


2012 - RESIDENTIAL SEWER SYSTEM AND BATHROOMS UPGRADE

Private owner living in Key Colony Beach requested removal of all old cast iron pipe for PVC bringing this property up to Code



2013 - RESIDENTIAL SEWER HOOK-UP



Subpages (1): Executed Contracts